Home » Products »

PPR Plastic Tee Pipe Fitting Mould

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2018-08-08 14:45

  • Browse the number:

    409

Send an inquiries
+
Taizhou Huangyan Huida Plastic Machinery Co.,Ltd
Contactaixin:

Contactaixin:

hyweida(Mr.)  

Email:

telephone:

phone:

Area:

Zhejiang

Address:

No.168, Kangqiang Road, North Industrial Area, Huangyan, Taizhou, Zhejiang, China

Website:

http://www.pipingmold.com/ http://hyweida.easydiet-hometraining.com/

+

Mould name:PPR plastic tee  pipe fitting mould  


General Mold Specifications:
Mould name :PPR plastic tee pipe fitting mould
Plastic material:PPR
Steel of Cavity & Core:DIN 1.2316
Steel of Mouldbase:S50C.LkM standardetc
Nos of Cavity:8 cavities
Fitting standard:EN
Core pulling system:angle pin
Injection molding machine:Engel ES3550/550K
Gate system:Direct gate
Design software:AutoCAD/UG/Solidworks
Mould heat treatment: Tempering/Quenching
Surface treatment: Polish/Etched...ect.
Mould ejector way: Slide.
Hardness of Cavity & Core:35-52HRC
Hardness of Wear Parts:45-52HRC
Core pulling system:angel pin
Mould Accessories:HASCO Standard.


FAQ

Q: 1 Are you trading company or manufacturer ?

A: We are factory for making pipe fitting moulds


Q: 2 Where is your factory located?

A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 15 minutes from train station to our factory.


Q: 3. How to go to your factory?

A: You can come to our city by flight, bus or train.

It takes 2 hours by flight from Guangzhou to our city.

It takes 3.5 hours by train from Shanghai to our city.

It takes 1 hour by bullet train from Ningbo to our city.


Q4: How long is the lead-time for a plastic injection mold?

A4: It all depends on the mold’s size and complexity.Normally, the lead time is 45—60days.
If the Plastic Mouldings are very simple and not big size, we can work out within 40days.


Q5: Do you build hot runner plastic moulds?

A5: Yes. We build hot runner Plastic Moulds and specialized in many different systems, such as DME,Master,Mastip,Hasco,Yudo,Incoe,Husky,etc.
The manifold recommended for your tool is selected to meet your individual needs.


http://www.pipingmold.com/